Page 19 - ar2012

Basic HTML Version

Construction of the Northern Tunnel Portal
in progress in Semantan for the Klang Valley
Mass Rapid Transit (Sungai Buloh – Kajang
Line) (KVMRT, SBK Line). Tunnel Boring
Machines will be launched here for the
9.5km underground twin tunnel alignment
Engineering
& Construction
*
All pictures of the KVMRT, SBK Line project shown in this section were
taken during the production period of this Annual Report