Page 26 - ar2012

Basic HTML Version

024
Gamuda Berhad (29579-T) • Annual Report 2012
A total of nine feeder stations will transform raw 132kv electricity tapped
from the local TNB power grid into 25kv to power the trains’ movements.
The first completed and energised feeder station is pictured here at Lahat,
Perak
Signaling and Control systems are currently being installed at the Bukit
Mertajam Centralised Traffic Control (CTC) facility, which will oversee and
manage all railway operations within the Ipoh - Padang Besar double track
project area, whilst communicating and synchronising train movements
with the existing CTC at KL Sentral
All Overhead Catenary System masts that would carry the high-tension cables to
power the railway tracks have been installed along the 3.5km Bukit Merah Marine
Viaduct in Perak