023
Operations
Review
Gamuda Berhad (29579-T)
Annual Report 2013
Aerial view of the Semantan Portal. Two Earth Pressure Balance Tunnel Boring Machines (EPB TBMs) were launched from this portal and tunnel towards the KL Sentral
MRT station.
Assembly of the third and fourth VD TBMs in progress at the Cochrane Launch Shaft (foreground). These two VD
TBMs will mine towards the Maluri MRT station. In the background are two tunnel mouths from which the first and
second VD TBMs were launched earlier this year.