18 February 2013
MMC-Gamuda JV (MGJV) collaborated with
Jabatan Bomba
& Penyelamat Kuala Kangsar
to conduct an internal mock
drill at the twin-bore Berapit Tunnel of the EDTP (Ipoh –
Padang Besar). The event was officiated by the Director of
Bomba Perak Tuan Haji Yahaya bin Haji Madis. The mock
drill aimed to prepare MGJV’s Emergency Response Team
(ERT) for exigencies in the tunnel and was monitored by
marshals from Keretapi Tanah Melayu Berhad (KTMB)
and EDTP (Ipoh – Padang Besar)’s project management
consultant Kinta Samudera Emenea Techart Sdn Bhd
(KSET).
6, 7 & 11 March 2013
The assembly of the first Variable Density Tunnel Boring
Machine (VD TBM) took place at the Cochrane Launch
Shaft, located near S.M.K. Convent Jalan Peel in Kuala
Lumpur. Due to the immense weight of the machine, the
70-tonne cutterhead was lowered carefully with a crane
at a speed of one meter in every two minutes. The entire
process of lowering the cutterhead, front and middle
shields of the VD TBM took approximately three working
days.
25 March 2013
Minister of Federal Territories and Urban Wellbeing Y B
Dato’ Sri Raja Nong Chik bin Dato’ Raja Zainal Abidin,
together with the Greater Kuala Lumpur/Klang Valley
Performance Management and Delivery Unit (PEMANDU)
committee, visited the KVMRT, SBK Line’s Pasar Rakyat
MRT station work site. Also present were Greater Kuala
Lumpur/Klang Valley Director Y Bhg Dato’ Ahmad Suhaili
Idrus and MRT Corp CEO Y Bhg Dato’ Azhar Abdul Hamid.
Project and construction progress briefing was conducted
by MRT Corp Project Director Marcus Karakashian.